In Toronto, you need a building permit for a second story addition. This type of project is considered a major structural alteration and is explicitly listed under the Ontario Building Code and City of Toronto regulations as work that requires permitting. Whether you are adding an entire new floor to your main house or building above a garage, the process involves zoning checks, detailed plan submissions, and multiple inspections to ensure the final result is safe and code-compliant.

Why a Permit Is Required for a Second Story Addition

A second story addition changes the load and structure of your home in a significant way. The permit process ensures your plans comply with the Ontario Building Code, zoning bylaws, and safety requirements. This review also confirms the existing foundation and framing can handle the additional weight, and that proper fire safety, insulation, and ventilation measures are in place.

Failing to get a permit can result in:

  • Stop-work orders that halt construction

  • Fines that can exceed the permit cost

  • Orders to remove unpermitted construction

  • Difficulty selling your home due to compliance issues

Checking Zoning Bylaws Before You Apply

Before beginning design work, confirm that your property is zoned for a second story addition. Zoning bylaws vary by neighbourhood and may limit:

  • Maximum building height

  • Setback distances from property lines

  • Lot coverage percentage

  • Building above certain accessory structures

If your design does not meet these limits, you may need a minor variance through the Committee of Adjustment before you can apply for a permit.

Preparing Architectural and Structural Plans

A complete permit application must include professional architectural drawings. These plans outline the scope and details of your project, including:

  • Site plan showing the existing building and addition location

  • Floor plans for each level of the home

  • Elevations showing exterior changes and building height

  • Cross-sections with construction details

  • Structural engineer’s report on load-bearing capacity

  • Roof and drainage plans

These documents give city officials the information they need to evaluate safety and compliance.

Additional Permits for Mechanical Systems

A second story addition often means upgrading or expanding mechanical systems. You will need supplemental permits for:

  • Electrical work – issued through the Electrical Safety Authority

  • Plumbing – for any new bathrooms or fixture changes

  • HVAC – to ensure adequate heating, cooling, and ventilation

Including these in your planning stage helps avoid delays once construction is underway.

Submitting Your Building Permit Application

When your plans are complete, submit your building permit application either online via the City of Toronto’s portal or in person at a Toronto Building office. Your package should contain:

  • Completed application form

  • All architectural and structural drawings

  • Any required engineering reports

  • Energy efficiency documentation (if applicable)

  • Proof of variance approval if needed

The more complete your submission, the faster the review process will be.

Permit Fees for a Second Story Addition

Building permit fees in Toronto are calculated based on the size of the proposed addition. Below is a general guide:

Project Size Estimated Permit Fee Range Notes
Small addition (up to 500 sq ft) $1,000 – $1,800+ Lower complexity; fees vary by exact size
Medium addition (500–1,000 sq ft) $1,800 – $3,000+ Includes most full second floor additions to bungalows
Large addition (over 1,000 sq ft) $3,000 – $5,000+ Complex projects with multiple trade permits required

These fees cover the building permit only. Electrical, plumbing, and HVAC permits are billed separately.

It’s important to understand these fees so that you can properly calculate the cost of your second story addition.

Plan Review and Approval

After submission, the City of Toronto reviews your application to ensure compliance with the Ontario Building Code, zoning rules, and safety laws. A straightforward application for a compliant project may be approved within several weeks, but more complex cases or applications requiring revisions will take longer.

Required Inspections During Construction

Throughout the build, you must schedule inspections at key stages. These may include:

  • Foundation work if modifications are made

  • Framing before insulation and drywall installation

  • Plumbing, HVAC, and electrical rough-ins and finals

  • Final inspection before occupancy

Construction cannot be signed off until all inspections are passed.

Risks of Building Without a Permit

Skipping the permit process is risky. Aside from fines and stop-work orders, you could be ordered to remove non-compliant work. In addition, unpermitted additions can lower your property value and cause problems when refinancing or selling.

Typical Project Timeline

A second story addition takes time to plan and execute. Typical timelines are:

  • Pre-application zoning review: 1–2 weeks

  • Design and engineering: 4–8 weeks

  • Permit review: 6–10 weeks for complete applications

  • Construction: 3–6 months or more, depending on size and weather

How to Make the Process Smoother

To keep your project on track, consider:

  • Hiring a contractor and architect with second story addition experience in Toronto

  • Confirming zoning requirements before starting design work

  • Submitting complete, accurate applications to avoid review delays

  • Scheduling inspections in advance to prevent downtime

Final Thoughts

A second story addition can dramatically expand your living space and boost your home’s value, but it is also a complex undertaking that always requires a building permit in Toronto. 

The process involves zoning checks, professional design and engineering, supplemental permits for mechanical systems, city reviews, and multiple inspections. 

Toronto General Contractors has extensive experience with these projects and can manage every step, from initial planning and zoning review to final inspection approval. Contact us today to start planning your second story addition with confidence.