How Much Does It Cost To Build an ADU in Toronto?
The cost to build an ADU (Accessory Dwelling Unit) in Toronto typically ranges from $250,000 to $350,000+ for larger or luxury units.
Factors such as size, materials, finishes, site conditions, and amenities all influence the final price. Smaller, basic builds may fall closer to $150,000 - $200,000, while high-end, fully customized ADUs can exceed $500,000.
Understanding how each element impacts cost will help you plan a realistic budget and make smart choices for your project.
What Is an ADU in Toronto
In Toronto, an ADU - also known as a garden suite, laneway suite, or secondary dwelling - is a self-contained residential unit built on the same lot as a primary home. These units are often used for rental income, multi-generational living, or as a private workspace. They must meet Ontario Building Code requirements and Toronto zoning bylaws, which regulate size, setbacks, and design.
Average Cost Ranges for ADUs in Toronto

Key Factors That Influence ADU Costs
Size and Layout
The larger the ADU, the higher the cost due to increased material, labor, and permit requirements.
- Small ADUs (300 - 450 sq ft): Efficient and cost-effective, suited for single occupants or couples.
- Mid-sized ADUs (450 - 550 sq ft): Balanced space and cost, ideal for long-term living.
- Large ADUs (600 - 1,000+ sq ft): Comfortable for small families but significantly more expensive.
Building Materials
Material choice impacts both upfront cost and long-term maintenance.
- Budget-friendly options: Vinyl siding, laminate counters, standard fixtures.
- Premium options: Cedar siding, quartz counters, hardwood flooring, triple-pane windows.
Eco-friendly materials like bamboo flooring, reclaimed wood, and energy-efficient insulation can cost more initially but may reduce long-term operating costs.
Site Conditions
Grading, soil stability, tree preservation, and access for construction equipment can add $20,000 - $60,000+ to your budget. Narrow lots or properties with significant landscaping may require additional preparation.
Amenities and Features
The level of amenities can change your budget dramatically.
- Essential features: Compact kitchen, full bathroom, basic appliances.
- Luxury upgrades: Smart home integration, high-end appliances, spa-style bathrooms, custom cabinetry.
Specialized built-ins like Murphy beds or integrated storage can improve usability but increase costs.
ADU Cost Breakdown by Component
Building vs Buying an ADU
Buying a Pre-Built or Prefab Unit
- Pros: Lower base cost, faster installation, predictable design.
- Cons: Limited customization, variable quality, and additional site preparation costs.
Base prefab prices may be $50,000 - $100,000, but after site work and hookups, the total can reach $200,000 - $300,000.
Building a Custom ADU
- Pros: Complete control over design, higher construction quality, full integration with property.
- Cons: Higher overall cost, longer build time, potential for budget overruns.
Custom builds in Toronto usually fall between $250,000 and $500,000+ depending on size and finish level.
Permits and Legal Considerations in Toronto
Building an ADU in Toronto requires compliance with zoning bylaws and the Ontario Building Code. Permits for ADUs typically cost $1,500 - $2,000, covering building permits, zoning review, and development charges. Certain neighborhoods may have additional requirements for heritage preservation, setbacks, or parking.
Timeline for Building an ADU
The entire process from planning to move-in generally takes 6 - 12 months.
- Design & permits: 2 - 4 months
- Site prep & foundation: 1 - 2 months
- Construction: 3 - 6 months
Weather, material delays, and permitting backlogs can extend timelines.
Long-Term Value of an ADU in Toronto
A well-built ADU can increase property value, generate rental income, and provide flexible living space for family members. Demand for legal, code-compliant ADUs in Toronto is growing, making them a strong investment when constructed with quality materials and thoughtful design.
Most Expensive Parts of an ADU Project
Labor and materials are the largest expenses, making up 30 - 60% of the total cost. Skilled trades such as plumbing, electrical, and HVAC installation are essential for meeting safety codes and ensuring longevity. High-end materials like cedar siding, stone countertops, and energy-efficient windows also add significantly to the budget.
Tips to Control ADU Costs
- Choose a right-sized design to avoid unnecessary square footage.
- Use durable mid-range materials that balance cost and longevity.
- Limit structural complexity to reduce labor time.
- Get multiple contractor quotes to ensure competitive pricing.
- Plan amenities based on must-haves vs nice-to-haves.
Final Takeaway
In Toronto, building an ADU can cost anywhere from $150,000 for a basic unit to $500,000+ for a luxury build. Most homeowners will spend between $250,000 and $350,000 for a well-designed, comfortable, and code-compliant unit.
By understanding the cost factors - size, materials, site conditions, and amenities - you can create a realistic budget that delivers value for years to come. If you’re ready to explore your options, Toronto General Contractors can guide you through the entire process - from design and permitting to final construction - ensuring your ADU is built on time, on budget, and to the highest standards.
Contact us today for a free, no-obligation consultation and take the first step toward your ideal secondary suite.
Frequently Asked Questions About ADUs in Toronto
What is the cheapest way to build an ADU?
The most affordable way to build an ADU in Toronto is to choose a smaller footprint (300–450 sq ft), use a prefabricated design, and stick to standard finishes. Selecting cost-effective materials like vinyl siding and laminate countertops, minimizing custom features, and building on a lot with minimal site preparation needs can also keep costs lower.
Is building an ADU a good investment?
Yes. A well-designed, legal ADU can increase your property’s value and generate consistent rental income. In Toronto’s high-demand housing market, ADUs often provide a strong return on investment - especially when built with quality materials and efficient layouts.
What is one drawback of an ADU?
One drawback is the high upfront cost. Even a modest ADU in Toronto can cost $150,000 or more. Additionally, navigating permits, zoning rules, and site preparation can add complexity and time to the project.
What is the most expensive part of building an ADU?
Labor and materials are typically the biggest expenses. Skilled trades like plumbing, electrical, and HVAC installation can account for a large portion of the budget, and high-quality finishes or custom features - such as premium flooring, cabinetry, or energy-efficient windows - can further increase costs.
What is the best size for an ADU?
The ideal ADU size depends on your budget, property size, and intended use. Many Toronto homeowners find that 450–550 sq ft strikes the best balance - large enough for comfortable living with a kitchen, bathroom, and bedroom, yet small enough to keep construction costs reasonable.